|
|
Newest Building
The College’s newest 35,000 sq. ft. facility, was completed in April 2006. The Elliott Auditorium will host our commencement ceremonies as well as other college events. It has been equipped with the latest in Audio/Video design, incorporating even the ability for the audience to participate via response remotes. The new Assessment Center is a state-of-the-art training center designed to enhance the training of doctors of chiropractic. At the core of the center is eight simulated treatment rooms. Each room contains typical furnishings and equipment found in most doctors’ offices with a few added extras such as private observation areas and the incorporation of video technology. According to Dr. Richard G. Brassard, TCC president, “The Assessment Center was designed with input from UTMB – Galveston and will put Texas Chiropractic College at the leading edge of chiropractic education. We’ll be able to assess our interns, and, if any weaknesses are found, we’ll be able to remediate those weaknesses with the most advanced technology available today."
Building Houses
- The Dr. Shelby & Connie Elliott 750-seat auditorium
- over 40 faculty offices
- The Assessment Center; State-of-the-Art & Video Enhanced
- Two Classrooms
- Wet lab for Biology, Physics, General and Organic Chemistry
|